Back to Home

Company Projects

1-Mashhad Light Transit Railway Urban Installations

Position: Mashhad LTR Corridors.
Commander: Mashhad Urban Railway Co.pjs
Goal: Remove and Reinstal the inconvenient urban installations
Situation: in progress
Beginning Date: 2002

Photo1

2-Reconstruction Jahad of khorasan Province Building

Survey phase: designing , monitoring.
Position: Mashhad, Khayyam Bulevard
Area: 23000 m2
Beginnig Date : 1992
Finishing Date: 1997

Photo2

3-Desired enjoyment from the flood of Shileh Sistan River - phase I

Position: Sistam & Baloochestan Province.
Commander: Reconstruction of Sistan Organization
Goal:Desired enjoyment from the flood of the river
Area: 130000 Hect.
Beginming date: 1997

Finishing date: 1999
Photo3

4-Asadiieh Birjand Reservoir Dam

Phase: phase III (monitoring).
Commander: South Khorasan Water Organitation
Position:135 km after south eastern of Birjand
Goal: Control and collecting of seasonal floods for agricultural lands
Dam type: Ciement Store-Dam

Height from river bed: 39.5m
Height from fonndation bed:49.6m
Top length: 143m
Top width: 5m
Store volume: 24.16 million m3
Spillway: shout & bucket spillway
Flood design flow: 227 m3/sec
Deviation system type: rectangular channel
Beginnig Date: 2003 Dec.
Finishing Date: 2005 Jan.
Photo4



 © 2005 Sazab_e_Shargh Consulting Engineers Company             Designed By: Behrouz Azimi